The Camp Timberwolf committee puts a new lining in the camp water storage tank to bring it up to code and to prolong its useful life.

Jerry Bellows arrives with equipment.

Jerry and Rudi and the water storage tank.

Committee President, Rudi Metzner, with sand blasting equipment.

Rudi Don't mess with me, I was just sand blasting!

Jerry outside Jeff is in there!

The job site work in progress.

Jeff Koester mixes epoxy to be applied to the tank.

Jerry Bellows painting the inside of the tank.

Rudi applies fiberglass reinforcing.